Site Feedback

Title 10

You are viewing the current version of the eCFR. The eCFR is up to date as of 8/01/2021.

Title 10

eCFR Content

Editorial codification of the general and permanent rules published in the Federal Register.

§ 50.90 Application for amendment of license, construction permit, or early site permit.

Whenever a holder of a license, including a construction permit and operating license under this part, and an early site permit, combined license, and manufacturing license under part 52 of this chapter, desires to amend the license or permit, application for an amendment must be filed with the Commission, as specified in §§ 50.4 or 52.3 of this chapter, as applicable, fully describing the changes desired, and following as far as applicable, the form prescribed for original applications.

[72 FR 49504, Aug. 28, 2007]